MetreMate for Glass & Glazing Suppliers
Glazing areas and window counts from the schedule
Measure glass areas in square metres, count identical units off the schedule and elevations, and quote glazing from a PDF plan.
No credit card needed. Free plan to start, works on Windows and Mac.

Why glass & glazing suppliers choose MetreMate
Glass and glazing suppliers use MetreMate to quote from the window schedule and elevations. Set the scale, measure each unit's glazing area in square metres, count identical units with live totals, and measure balustrade and shopfront runs in lineal metres. Text notes tag each unit type, so staff turn the schedule and elevations into a clean, checkable glass takeoff priced per square metre by glass type without a scale ruler.
Quote in minutes, not hours
Set the scale once and measure straight off the PDF. Your first measurement takes under 90 seconds, and it's free to start.
Try MetreMate, it's freeNo credit card needed
The slow way, or the smart way
What changes when glass & glazing suppliers measure in MetreMate instead of off a printout.
Without MetreMate
- Pulling every unit off a schedule and deducting frames by hand
- Counting repeated units where a miscount hits the tender margin
- Balustrade and shopfront runs measured inconsistently
With MetreMate
- Count for identical units with live totals
- Area tool for glazing square metres
- Measure for framing and bead lineal metres
- Text notes to tag unit types
- Pencil tool for freehand mark-ups, and to add your initials or signature by hand
500+
Tradies using MetreMate
50,000+
Measurements taken
90s
Average time to measure
Everything you can measure off the plan
Set the scale once, then pull the quantities glass & glazing suppliers actually quote on.
Lengths & lineal metres
Any distance, edge, or run measured straight off the plan.
Areas in mΒ²
Trace rooms, slabs, and zones for instant square metres.
Perimeters
Boundary and edge runs totalled for you, no maths.
Counts
Tap to count fixtures, fittings, and symbols with live totals.
Step by step
How glass & glazing suppliers use MetreMate
- 1
Glazing area
Measure each unit and balustrade area in square metres off the elevations.
- 2
Count the units
Count identical units with live totals straight from the schedule.
- 3
Tag and total
Use text notes to tag unit types and keep the takeoff checkable.
More than measuring
Auto-scaling, layers, and exports that keep the whole job moving. Tap any tool to see how it works.
Auto Scale
Start measuring sooner with plan scale suggestions
Speed up plan setup by detecting likely scale values so you can move into measurement faster.
Manual Scaling
Set PDF plan scale with confidence before you quote
Set the scale by hand so you can measure unusual, scanned, or hard-to-read PDF plans with confidence.
Auto Snap
Snap to plan points for faster, cleaner measurements
Snap to corners, intersections, and endpoints so plan measurements stay cleaner and faster to complete.
Layers Manager
Keep plan measurements organised by room, trade, or scope
Group measurements into layers so busy plans stay easier to review and manage.
Print & Share
Share measured plans and print clean markups without the back-and-forth
Print measured plans and share marked-up work more clearly with clients, teams, and subcontractors.
Project Organiser
Keep projects, plans, and measurements organised in one place
Organise projects and plan sets so jobs stay easier to navigate as your quoting workload grows.
MetreMate works for every supplier
Ready to quote faster, glass & glazing suppliers?
Upload your first plan and get accurate measurements in under 90 seconds. Free to start, no credit card needed.
Try MetreMate Today, It's Free!