Slab volume is length × width × thickness. Add a perimeter edge beam and the extra concrete is the ring area (slab area minus the inner rectangle inside the beam) times the beam depth. Around 110 × 20 kg bags of premixed concrete cover one cubic metre, or order ready-mix in 0.2 m³ steps.
Your job
Slab size
Thickness
Non-load-bearing slabs run 75 to 100 mm. Driveways and shed slabs typically 100 to 125 mm. Check your engineer's spec.
How you're mixing
Based on the published rate of 110 × 20 kg bags per m³, scaled by weight for other bag sizes.
Edge beam (perimeter footing)
Most domestic slabs have a thickened edge (edge beam). Turn this on and the calculator adds the extra concrete around the perimeter, without counting the corners twice.
Allowances
10% is fair for a small slab: covers uneven subgrade, spillage and losing a bit off the barrow. Push to 15% for a rough excavation.
Show on the drawing
Optional
Ask your supplier for a real number. The placeholder is a hint only and is never used in your result.
Drag the orange handles to resize the slab
20 kg bags
291bags
5,820 kg of bags (5.82 t) to cart
Total volume
2.400m³
24.00 m² × 100 mm
Slab area
24.00m²
The working, with your numbers
- 1. Slab area6.00 × 4.00= 24.00 m²
- 2. Slab volume24.00 × 100 / 1000= 2.400 m³
- 3. Bags of concrete2.400 × 110.0 × 1.10, round up= 291 × 20 kg
Concrete slab estimate (metremate.com/calculators/concrete-slab-calculator)
- Slab: 6.00 m × 4.00 m × 100 mm
- Area: 24.00 m² Total volume: 2.40 m³
- Concrete: 291 × 20 kg bags (5,820 kg, includes 10% wastage)
- Estimate only. Confirm quantities with your concreter or supplier.
The formula, in plain words
- 1Slab area = length times width, in square metres.
- 2Slab volume = area times thickness in millimetres, divided by 1000. That gives cubic metres.
- 3Edge beam volume = (slab area minus the inner rectangle inside the beam) times the beam depth. The inner rectangle is (length minus twice the beam width) by (width minus twice the beam width). That counts each corner once.
- 4Internal beams frame inside the edge beam ring. Each rib runs the full inside dimension by the rib width by the beam depth. Number of internal beams at spacing s across a span S is ceiling(S over s) minus 1. In grid mode, subtract the intersections so a crossing is counted once, not twice.
- 5Total concrete = slab volume plus edge beam plus internal beams.
- 6For bags: total volume times bags per cubic metre (about 110 for 20 kg premixed concrete), plus wastage, round up. Other bag sizes scale by weight.
- 7For ready-mix: total volume times (1 plus wastage), rounded up to the next 0.2 m³ the truck delivers in.
Worked example
A 12 m × 8 m house slab at 100 mm with 300 × 300 mm perimeter edge beams and a two-way internal grid of 300 mm ribs at 4 m centres, poured as ready-mix with a 10% wastage allowance.
- 1.Slab area: 12 × 8 = 96 m². Slab volume: 96 × 100 / 1000 = 9.6 m³.
- 2.Edge beam ring: 96 − (11.4 × 7.4) = 96 − 84.36 = 11.64 m². Edge volume: 11.64 × 0.3 = 3.492 m³.
- 3.Inner region: 11.4 × 7.4 m. Along-length ribs: ceil(7.4/4) − 1 = 1 rib × 11.4 × 0.3 × 0.3 = 1.026 m³.
- 4.Along-width ribs: ceil(11.4/4) − 1 = 2 ribs × 7.4 × 0.3 × 0.3 = 1.332 m³.
- 5.Intersections: 1 × 2 × 0.3 × 0.3 × 0.3 = 0.054 m³ (counted once, not twice).
- 6.Internal beams total: 1.026 + 1.332 − 0.054 = 2.304 m³.
- 7.Total concrete: 9.6 + 3.492 + 2.304 = 15.396 m³.
- 8.With 10% wastage: 16.936 m³. Round up to 17.0 m³ ready-mix.
Answer: About 17 m³ of ready-mix. Same slab as bags would be roughly 1,863 × 20 kg bags, so bags are not the right tool for this pour.
How to measure it
- Measure the slab in metres. Length times width gives the area.
- Get the thickness from your engineer's or council's spec. Typical: 75 to 100 mm non-load-bearing, 100 to 125 mm shed and driveway.
- If the slab has a thickened perimeter edge, turn on 'Add edge beam' and enter its width and depth off the plans. Domestic edge beams are commonly 300 × 300 mm; waffle raft and stiffened raft slabs go deeper.
- If the slab has internal ribs (waffle raft, stiffened raft) turn on 'Add internal beams', pick the direction (grid or one-way) and enter the spacing and rib width from the engineer's plan. Flip the drawing to 'Underside' to see the whole beam network from below.
- Choose bags or ready-mix. Small slabs (under about 0.5 m³) are usually bags; anything bigger is cheaper and quicker as ready-mix.
- Ask your supplier about the minimum load and short-load fee. A truck under-loaded still costs the same.
Where the numbers come from
Every default in the calculator is a number a supplier or manufacturer publishes. We list the source next to it so you can check.
| What | Value | Source |
|---|---|---|
| Premixed concrete, 20 kg bags needed for one cubic metre | 110 20 kg bags per m³ | Cement Australia slab calculator (checked 2026-09-21) |
Manufacturers named here are the source of the number, not a recommendation. Confirm quantities with your supplier.
Frequently asked questions
Stop typing measurements in by hand
MetreMate measures every wall, floor and roof straight off your PDF plan. Then it hands you the same numbers this calculator asks for.
Try MetreMate freeEstimate only. Check quantities and stocked sizes with your supplier. Free calculators at metremate.com/calculators.