Free calculator

Retaining wall calculator

Bays = run length ÷ (sleeper length + gap), per run. Courses = height ÷ 0.2 m. Sleepers = bays × courses. Each run has a C channel at both ends (so 2 at every corner) and an H channel between each pair of sleepers. Posts go at least 1 m into 450 mm holes of concrete.

Your job

Wall, run by run

Sleepers

Size (length × thickness, all 200 mm high)

Sizes listed are ones a named maker sells (see the references), with that maker's post spacing: posts at 2,030 mm centres here. Channels: 100 mm channels (fit sleepers up to 80 mm).

H and C channels

Posts are numbered from the start of the wall. Ends and corners always take C channels. Switch a joiner to 2 C channels (one closing each side) for a step or a planned break, here or by tapping it in the plan.

Run 1

Run 2

Posts and concrete

Concrete bag size

Embedment defaults to the guide's table: 1.0 m up to a 1.0 m wall, then the next 0.2 m step at or above the wall height (1.2, 1.4, 1.6 m), and the deeper listed value above 1.6 m, with 100 mm of concrete under the post. Every channel gets its own hole. Stock 100 mm channels run 0.9 to 3.6 m; anything longer, or walls over 1.8 m, need heavier posts your engineer specifies.

Drainage and moisture barrier

Ag pipe coil

Builder's plastic roll

Plastic covers the back of the wall: total length × retained height, with no allowance for laps. Ag pipe runs the full length of the wall.

At 0.80 m this is over the no-approval limit in WA, NSW. Check with your council before you build.

Optional

Ask your supplier. The greyed number is an example only and is never used in your result.

PlanStartCHHHCCHCRun 1: 8.00 mRun 2: 3.00 mTurn rightH channel, joiner: 4C channel, end: 4C channels close each run end (2 at each corner).Tap a joiner to switch it between an H channel and 2 C channels (a step or break).0.80 m1.00 m in groundFirst 3 of 4 bays in run 1 (6 in all) at 2,030 mm centresSectionSoil plug, 100 mm300 mm drainage gravelØ100 slotted ag pipeWall leans back 24 mm

Top: the wall from above, every H and C channel tagged; tap a joiner to switch it. Below: run 1 face on, and the drainage behind the wall.

Sleepers

24sleepers

6 bays × 4 courses of Concrete 2000 × 200 × 75 mm

H channels

4

Joiners between sleepers, 1.8 m long

C channels

4

2 per run: wall ends and 2 at each of 1 corner, 1.8 m long

Concrete

154× 20 kg

1.40 m³ for 8 holes 450 mm wide × 1.10 m

Ag pipe

1× 20 m

11.00 m of Ø100 slotted pipe along the wall

Plastic

1roll

8.8 m² of builder's plastic, 4 m × 50 m rolls

Gravel

1.98m³

Drainage, 300 mm wide behind the wall

Filter fabric

12.1m²

Between the soil and the gravel

The working, with your numbers

  1. 1. Bays8.00 ÷ 2.030 ↑ + 3.00 ÷ 2.030 ↑= 6
  2. 2. Courses0.80 ÷ 0.2, rounded up= 4
  3. 3. C channels2 × 2 runs= 4
  4. 4. H channelsbays − runs = 6 − 2= 4
  5. 5. Concrete8 × π × 0.225² × 1.10= 1.400 m³
  6. 6. Ag pipe11.00 ÷ 20, rounded up= 1
  7. 7. Plastic11.00 × 0.80 ÷ 200 m² a roll ↑= 1
  8. 8. Gravel11.00 × 0.3 × (0.80 − 0.2)= 1.98 m³
Typed those measurements in by hand?MetreMate measures them straight off your PDF plans. Free to start.

The formula, in plain words

  1. 1Build the wall as runs, each turning 90 degrees left or right from the last. Bays per run = run length ÷ (sleeper length + the maker's gap), rounded up. Courses = height ÷ 200 mm, rounded up.
  2. 2Sleepers = bays × courses. C channels = 2 per run (the wall ends, and 2 at every corner). H channels = bays − 1 in each run.
  3. 3Switch any joiner to a break (for a step or a planned break) and it takes 2 C channels, one closing the bay on each side: 1 H channel fewer, 2 C channels and 1 post hole more.
  4. 4Channel length = wall height + embedment (1.0 m up to a 1.0 m wall, then the guide's next step at or above the wall height), with 100 mm of concrete below. 100 mm channels suit sleepers up to 80 mm thick.
  5. 5Concrete = channels × π × (hole diameter ÷ 2)² × hole depth, in 10, 20 or 30 kg bags at 220, 110 or 67 a cubic metre.
  6. 6Ag pipe = total wall length, in the coil or length you buy. Builder's plastic = total length × retained height, in whole rolls. Drainage gravel: 300 mm behind the wall to 200 mm below the top.

Worked example

An 8 m run, then a 90 degree right turn into a 3 m run, 0.8 m high, in 2000 × 200 × 75 mm concrete sleepers, posts 1.0 m in the ground in 450 mm holes, 20 kg bags, 20 m ag pipe coils and 4 m × 50 m plastic.

  1. 1.Bays: 8 ÷ 2.03 = 3.9, so 4; 3 ÷ 2.03 = 1.5, so 2. 6 bays × 4 courses = 24 sleepers.
  2. 2.C channels: 2 runs × 2 = 4 (2 at the wall ends, 2 at the corner). H channels: 6 bays − 2 runs = 4. All 1.8 m long.
  3. 3.Concrete: 8 × π × 0.225² × 1.1 = 1.40 m³, 154 × 20 kg bags.
  4. 4.Ag pipe: 11 m, 1 coil of 20 m. Plastic: 11 × 0.8 = 8.8 m², 1 roll. Gravel: 11 × 0.3 × 0.6 = 1.98 m³.

Answer: 24 sleepers, 4 H and 4 C channels of 1.8 m, 154 × 20 kg bags of concrete, 1 coil of ag pipe and 1 roll of plastic.

How to measure it

  • Walk the wall from one end and measure each straight run, noting whether each corner turns left or right.
  • Measure the height of soil the wall will hold back.
  • Check the sleeper size and the post spacing your sleeper maker gives.
  • Mark any step in height or planned break, then tap that post in the plan to switch it to 2 C channels.
  • Check your council's height limit before you build; over 1 m, get an engineer.

Where the numbers come from

Every default in the calculator is a number a supplier or manufacturer publishes. We list the source next to it so you can check.

WhatValueSource
Concrete sleepers are 200 mm high: 2.5 per m² of wall for 2 m sleepers200 mmAustral Masonry, Explorer Sleeper Retaining Walls Installation and Technical Guide (2023) (checked 2026-10-01)
Concrete GO Sleeper 1.2 m: 200 × 80 × 1190 mm1,190 mm × 200 × 80 mmGalintel, GO Sleepers (checked 2026-10-01)
Concrete sleeper 1.5 m STD: 1500 × 200 × 75 mm1,500 mm × 200 × 75 mmOutback Sleepers Australia, Product Weight and Sizes Summary (2026) (checked 2026-10-01)
Concrete sleeper 1.8 m STD: 1800 × 200 × 75 mm1,800 mm × 200 × 75 mmOutback Sleepers Australia, Product Weight and Sizes Summary (2026) (checked 2026-10-01)
Explorer concrete sleeper 2000 × 75 × 200 mm2,000 mm × 200 × 75 mmAustral Masonry, Explorer concrete sleepers and posts (checked 2026-10-01)
Explorer concrete sleeper 2400 × 75 × 200 mm2,400 mm × 200 × 75 mmAustral Masonry, Explorer concrete sleepers and posts (checked 2026-10-01)
Concrete sleeper 2.4 m STD: 2400 × 200 × 80 mm2,400 mm × 200 × 80 mmOutback Sleepers Australia, Product Weight and Sizes Summary (2026) (checked 2026-10-01)
Timber sleepers 200 × 75 × 1800 mm in the guide's worked wall1,800 mm × 200 × 75 mmGalintel, Retaining Wall Post Selection & Installation Guide (checked 2026-10-01)
200 × 50 H4 treated pine sleeper, 2.4 m2,400 mm × 200 × 50 mmTasmanKB, treated pine sleepers (checked 2026-10-01)
200 × 75 H4 treated pine sleeper, 2.4 m2,400 mm × 200 × 75 mmTasmanKB, treated pine sleepers (checked 2026-10-01)
Post spacing = sleeper length + 30 mm (2030 mm centres for 2000 mm sleepers)30 mmAustral Masonry, Explorer Sleeper Retaining Walls Installation and Technical Guide (2023) (checked 2026-10-01)
Post centres = sleeper length + 10 mm (2010 mm for 2.0 m, 2410 mm for 2.4 m, the same allowance for other lengths)10 mmOutback Sleepers Australia, Sleeper Installation Guide (checked 2026-10-01)
GO Sleepers: post spacing = sleeper length + 15 mm15 mmGalintel, GO Sleepers heavy duty post installation guide (checked 2026-10-01)
Post spacing = sleeper length + 15 mm (1815 mm for 1800 mm timber sleepers)15 mmGalintel, Retaining Wall Post Selection & Installation Guide (checked 2026-10-01)
100 mm H and C channels fit sleepers up to 80 mm thick80 mm sleeper, maxGalintel Outdoors, Retaining Wall Posts range brochure (checked 2026-10-01)
150 mm H and C channels fit 100 mm sleepers100 mm sleeperGalintel Outdoors, Retaining Wall Posts range brochure (checked 2026-10-01)
Lighter 2.5 mm posts fit 50 and 75 mm timber sleepers, for walls up to 750 mm with no fence on top750 mm wall, maxGalintel Outdoors, Retaining Wall Posts range brochure (checked 2026-10-01)
A 90 degree corner takes 2 end posts (C channels)2 C channels per cornerAustral Masonry, Explorer Sleeper Retaining Walls Installation and Technical Guide (2023) (checked 2026-10-01)
Minimum pier embedment 1.0 m for walls up to 1.0 m, then 1.2, 1.4 and 1.6 m for walls up to 1.2, 1.4 and 1.6 m; taller walls take the deeper of the table's two values1 m minimumAustral Masonry, Explorer Sleeper Retaining Walls Installation and Technical Guide (2023) (checked 2026-10-01)
Minimum 100 mm of concrete below the post100 mmGalintel, Retaining Wall Post Selection & Installation Guide (checked 2026-10-01)
Post holes 450 mm in diameter450 mmGalintel, Retaining Wall Post Selection & Installation Guide (checked 2026-10-01)
100 series posts in 0.9 to 3.6 m lengths in 0.3 m steps0.9 m shortestGalintel, Retaining Wall Post Selection & Installation Guide (checked 2026-10-01)
Concrete Mix comes in 10 kg and 20 kg bags at 110 × 20 kg per m³, so 220 × 10 kg bags of the same mix220 10 kg bags per m³Cement Australia, Concrete Mix product data sheet (checked 2026-10-01)
Premixed concrete, 20 kg bags needed for one cubic metre110 20 kg bags per m³Cement Australia slab calculator (checked 2026-09-21)
Post Mix Concrete: 1 × 30 kg bag = 0.0151 m³, 67 × 30 kg bags = 1.0 m³67 30 kg bags per m³Easy Mix, Post Mix Concrete technical data sheet (checked 2026-10-01)
Ø100 slotted ag pipe with filter sock in 20 m coils (100 m coils with the RTA sock)20 m and 100 m coilsVinidex, Draincoil SN8 CL400 with Filtersock (checked 2026-10-01)
200 micron builder's film in 2 m × 50 m and 4 m × 50 m rolls50 m rolls, 2 m or 4 m widePlastpack, Builders film (checked 2026-10-01)
300 mm of 20 mm crushed rock behind the wall to 200 mm from the top, Ø100 slotted ag pipe at 1 in 100 (max 30 m run), filter fabric, 100 mm soil plug300 mmAustral Masonry, Explorer Sleeper Retaining Walls Installation and Technical Guide (2023) (checked 2026-10-01)
Lean the wall back at least 30 mm for every 1.0 m of height30 mm per mAustral Masonry, Explorer Sleeper Retaining Walls Installation and Technical Guide (2023) (checked 2026-10-01)
Walls over 1 m or carrying loads such as structures or pools may need an engineer's design1 mTimber Preservers Association of Australia, Technical Note 4 (checked 2026-10-01)
WA (City of Vincent): retaining walls over 500 mm need a building permit0.5 mCity of Vincent, Retaining wall (checked 2026-10-01)
NSW: exempt only up to 600 mm above existing ground and at least 1 m from a boundary0.6 mWollondilly Shire Council, Retaining Walls Fact Sheet (2024) (checked 2026-10-01)
QLD (Brisbane): no approval only if 1 m or less, no load behind it, and 1.5 m from a building or another wall1 mBrisbane City Council, Retaining wall (checked 2026-10-01)
VIC (Boroondara): a building permit is always needed over 1 m1 mCity of Boroondara, Retaining wall permits (checked 2026-10-01)

Manufacturers named here are the source of the number, not a recommendation. Confirm quantities with your supplier.

Frequently asked questions

Still have a question?

Ask the help assistant for an instant answer, or start free and try it on your own plans.

Recorded in the real app

Watch a wall run measured off an aerial photo

Trace a property boundary on an aerial photo with MetreMate's Perimeter tool: click each corner, watch each run and the running total appear, then name the result for the fence quote.

See the Perimeter tool

Stop typing measurements in by hand

MetreMate measures every wall, floor and roof straight off your PDF plan. Then it hands you the same numbers this calculator asks for.

Try MetreMate free