MetreMate for Cladding Suppliers

Cladding area and board lineal metres from the elevations

Measure facade areas from elevations, convert to board lineal metres by board cover, and quote cladding from a PDF plan.

No credit card needed. Free plan to start, works on Windows and Mac.

Cladding Suppliers materials
Under 90s to your first measurement

Why cladding suppliers choose MetreMate

Cladding suppliers use MetreMate to measure facade area off the elevations, then convert to board lineal metres. Set the scale, trace each elevation area in square metres, deduct windows and doors, and convert to lineal metres using your board cover. Measure corner and trim runs and count boards or sheets, so staff quote weatherboard, fibre cement or composite cladding by the board or lineal metre with the right wastage, without a scale ruler.

Quote in minutes, not hours

Set the scale once and measure straight off the PDF. Your first measurement takes under 90 seconds, and it's free to start.

Try MetreMate, it's free

No credit card needed

The slow way, or the smart way

What changes when cladding suppliers measure in MetreMate instead of off a printout.

Without MetreMate

  • Getting cladding quantities off elevations with openings deducted by hand
  • Converting square metres to board lineal metres via board cover
  • Corner and trim runs across multiple facades

With MetreMate

  • Area tool for facade area from elevations
  • Measure for corner and trim lineal metres
  • Count for boards and sheets
  • Layers per elevation
  • Pencil tool for freehand mark-ups, and to add your initials or signature by hand

500+

Tradies using MetreMate

50,000+

Measurements taken

90s

Average time to measure

Everything you can measure off the plan

Set the scale once, then pull the quantities cladding suppliers actually quote on.

Lengths & lineal metres

Any distance, edge, or run measured straight off the plan.

Areas in mΒ²

Trace rooms, slabs, and zones for instant square metres.

Perimeters

Boundary and edge runs totalled for you, no maths.

Counts

Tap to count fixtures, fittings, and symbols with live totals.

Step by step

How cladding suppliers use MetreMate

  1. 1

    Facade area

    Trace each elevation area in square metres and deduct openings.

  2. 2

    Boards by cover

    Convert the deducted area to board lineal metres using your board cover.

  3. 3

    Corners and trims

    Measure corner, trim and flashing runs in lineal metres.

Cladding Suppliers FAQs

Questions cladding suppliers ask

MetreMate works for every supplier

Ready to quote faster, cladding suppliers?

Upload your first plan and get accurate measurements in under 90 seconds. Free to start, no credit card needed.

Try MetreMate Today, It's Free!