MetreMate for Electrical Contractors

Count devices and measure runs off the E-sheets

Count receptacles, switches, fixtures and panels with running totals, and measure conduit and home runs in linear feet, straight off the PDF.

No credit card needed. Free plan to start, works on Windows and Mac.

Electricians wiring a post-mounted electrical panel outside a commercial building on a jobsite
Under 90s to your first measurement

Why electrical contractors choose MetreMate

Electrical contractors use MetreMate to take off devices and runs from PDF electrical plans. Count receptacles, switches, recessed lights, fixtures by type tag, smoke detectors, data drops and panels with running totals, and measure conduit, MC and NM cable, home runs and feeders in linear feet. Set the scale once per sheet off a known dimension, then build your bid from the counts. It runs in any modern browser on a Windows or Mac computer, with nothing to install.

Quote in minutes, not hours

Set the scale once and measure straight off the PDF. Your first measurement takes under 90 seconds, and it's free to start.

Try MetreMate, it's free

No credit card needed

The slow way, or the smart way

What changes when electrical contractors measure in MetreMate instead of off a printout.

Without MetreMate

  • Clicker in one hand and highlighter in the other across twelve E-sheets
  • Losing count of recessed lights halfway through a reflected ceiling plan
  • Guessing home run footage and eating the wire

With MetreMate

  • Count with live totals per symbol type
  • Measure for conduit and cable runs
  • Layers for power, lighting and low voltage
  • Easy Zoom on dense sheets

Everything you can measure off the plan

Set the scale once, then pull the quantities electrical contractors actually quote on.

Lengths in linear feet

Any wall, run or edge measured straight off the plan.

Areas in sq ft

Trace rooms, slabs and roofs for instant square footage.

Perimeters

Boundary and edge runs totaled for you, no maths.

Counts

Tap to count fixtures, fittings, and symbols with live totals.

Step by step

How electrical contractors use MetreMate

  1. 1

    Device and fixture counts

    Click each receptacle, GFCI, switch, recessed light, smoke detector and data drop on the plan. Count keeps a running total per symbol type, so fixtures stay split by their type tag from the fixture schedule and nothing gets counted twice.

  2. 2

    Conduit and cable runs

    Trace conduit, MC and NM cable, home runs and feeders with Measure and read the plan length in linear feet. Trench runs come off the site plan the same way. You add your own allowance for drops and makeup when you build the bid.

  3. 3

    Power and lighting on separate layers

    Put the power plan, the lighting plan and low voltage on their own layers. Switch layers on and off to check one system at a time, and keep rough-in and trim-out quantities easy to pull apart.

Electrical Contractors FAQs

Questions electrical contractors ask

MetreMate works for every trade

Ready to bid faster, electrical contractors?

Upload your first plan and get accurate measurements in under 90 seconds. Free to start, no credit card needed.

Try MetreMate Today, It's Free!