MetreMate for Fence Contractors

Fence lines in linear feet, posts and gates counted

Measure every fence run off the site plan or survey, count gates and corners, and work out posts at your spacing before you walk the property.

No credit card needed. Free plan to start, works on Windows and Mac.

Fence builder nailing wood pickets to a rail with a hammer on a residential jobsite
Under 90 seconds to your first measurement

Why fence contractors choose MetreMate

Fence contractors use MetreMate to measure fence runs in linear feet from PDF site plans, surveys and plot plans. Trace each run by fence type and height, count gates, corners and end posts, and divide the footage by your post spacing to get post counts before you visit the property. Calibrate off a labeled property line when the plan is at an engineer scale. It runs in any modern browser on a Windows or Mac computer, with nothing to install.

Quote in minutes, not hours

Set the scale once and measure straight off the PDF. Your first measurement takes under 90 seconds, and it's free to start.

Try MetreMate, it's free

No credit card needed

The slow way, or the smart way

What changes when fence contractors measure in MetreMate instead of off a printout.

Without MetreMate

  • Driving across town to wheel off a yard for a bid you might not get
  • Surveys and plot plans at an engineer scale your ruler does not have
  • Post counts that miss the corners and gate posts

With MetreMate

  • Measure for fence runs in linear feet
  • Count for gates, corners and ends
  • Manual Scale for surveys and scanned plot plans
  • Layers per fence type

10,000

MetreMate users

1 million+

Annotations made on plans

50,000

Projects created

90 seconds

Average time to measure

Everything you can measure off the plan

Set the scale once, then pull the quantities fence contractors actually quote on.

Lengths in linear feetMeasure

Step by step

How fence contractors use MetreMate

  1. 1

    Fence runs by type

    Trace each run on the site plan, survey or plot plan and read it in linear feet. Keep wood privacy, vinyl, chain link and ornamental aluminum apart, and split runs by height, so each line on the bid has its own footage.

  2. 2

    Posts at your spacing

    Take the linear feet for each run and divide by your post spacing. Round up to whole sections, add one, then add corner, end and gate posts. MetreMate gives you the footage and the counts, then you apply your spacing and your rail and picket layout.

  3. 3

    Gates and corners

    Drop a count marker on every gate, corner and end post. Keep walk gates and drive gates as separate counts so each width gets its own line, and every marker stays on the plan for the crew and the property walk.

Fence Contractors FAQs

Questions fence contractors ask

Straight answers for fence contractors on measuring from plans, accuracy, sharing and plans and pricing.

Who we serve

MetreMate works for every trade

See how other trades measure plans, count items and price jobs with MetreMate.

Ready to bid faster, fence contractors?

Upload your first plan and get accurate measurements in under 90 seconds. Free to start, no credit card needed.

Try MetreMate Today, It's Free!